Impala Platinum No 20 Shaft Project Type: Shaft Sinking, Impala Platinum Mine Construction Date: August 2005 - 2011 Location: Rustenburg, South Africa S 25.422559° E 27.157152° |
|
|
The Impala Platinum Shaft 20, situated close to Sun City started early 2005. During stabilization of the shaft rock face Vibrating Wire Strain Gauges were installed at various pre-determined positions. Strain Gauges were installed in a two dimensional rosette (horizontal and vertical) formation and embedded with shotcreet.
Impala Platinum Mine Instrumentation consists of the following:
Installed Instruments Specification:
Designers: N/A Consulting Engineers: TWP Consulting Contractors: Murray & Roberts, Grinaker LTA |
|
|